DEBRIS FLOW PROTECTION
DEBRIS FLOW PROTECTION
Proje: Borusan EnBW
Place: Erzurum
Country: Türkiye
Year of Installation: 2019
Client: Borusan EnBW
Engineering: Geobrugg AG
Contractor: Artusa Geohazard Solutions
Initial Situation: At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system. Around 5'000 m³ of debris damaged the HPP area.
Description: At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.
Installed Sytems: Debris Flow Barrier line VX160-H6
Corrosion Protection: GEOBRUGG SUPERCOATING®
Height: 6.0 m Length: 18.5m Number of Barriers:1
Retention Capacity: 3000 m³
Artusa Services Related to This Project :
- Scaling
- Rock Bolting
- Debris Flow Protection
- Restricted Access Drillings
- Design Services